The cart loaded and waiting on the night shift

The press is still running early in the night shift, with the next mold and its loaded cart beside it. This shift loaded the cart late last week, and this time the mold change took 46 minutes.

Press 12, Sep 9, 10:22 pm, Camera 6

Every cart loaded ahead, and the fastest week yet

The job log shows each press's mold changes and their median time, and the cameras show when each cart was loaded. All nine had the cart loaded ahead and took a median of 47 minutes, against 63 across the plant before.

Presses 7 and 12, Sep 7 to Sep 11, ERP job log

From the plant's ERP
PressMold changesCart loaded before the stopMedian time per mold change
Press 733 of 346 minutes
Press 1266 of 648 minutes
Both presses99 of 947 minutes