Implementation plan

1. List scrap by mold, weigh bins

The list names the molds, and the bins show whether they still make the scrap.

Action
  • List last month's scrap by mold from the ERP, and by shift where it is recorded.
  • At the start of a shift, empty the scrap bins of the three molds highest on the list that are running, and of one other press.
  • At the end of the shift, weigh the rejected parts in each bin on the floor scale.
  • Note whether every rejected part has its flaw in the same place.
OwnerA process technician
PurchasesNone
DecisionDo the same few molds lead the list and fill their bins, with flaws that change from part to part?
FallbackIf every part has its flaw in the same place, that mold goes to the mold shop first.

2. Test settings on the worst molds

Test runs find the settings at which each mold makes good parts.

Action
  • Take one mold at a time, in its usual press, with its usual plastic.
  • Change one setting at a time, such as fill speed, pressure or cooling time.
  • Weigh and check the parts of each run, and note where they start to go bad.
  • Choose the settings in the middle of the range where parts stay good.
  • Where a customer has approved a part's settings, get their sign-off before using new ones.
OwnerA process technician
PurchasesNone. About 72 technician hours and 1,200 lb of test parts, about $5,800 in all.
DecisionDoes the mold make good parts across a range of settings, not just at one point?
FallbackIf there is no such range, the mold or the plastic is the cause, and tests on that mold stop.

3. One signed sheet at each press

Every shift starts from the same settings, and each change carries a name.

Action
  • Write the chosen settings on one sheet and post it at the press.
  • Every shift starts the job from the sheet.
  • Any change is written on the sheet with a name, the time and the reason.
  • The technician reads the changes every week, and adds a change to the sheet if it works.
  • Weigh the rejected parts of these molds every week for a month.
OwnerA process technician, with each shift's supervisor
PurchasesNone
DecisionDoes the weighed scrap on these molds fall, and stay down for a month?
FallbackIf the scrap returns on one shift, that shift starts its next run with the technician at the press.

Illustrative sample. The plant, the walk and the footage are synthetic. Figures from our analysis are estimates made with AI, not guarantees.