Why it works

Mechanism
  • On a long job, every part needs the same trimming and packing, and the person waits until the next one drops.
  • With the parts of two presses at one table, the person fills the wait at one press with work for the other.
  • The counters count the parts, so nobody has to watch a box fill.
Math
  • One person at each of three presses for about 2,500 hours per year is 7,500 operator hours.
  • If one person handled two presses, at most half of those hours would be freed.
  • We assume 25 percent: 1,875 hours, worth about $56,300 per year at $30 per hour.
  • After about $900 per year of upkeep, about $55,400 is left.
  • The chutes, belts and counters cost about $15,000, repaid in about 3.5 months.
Industry evidence
  • Makers of part conveyors sell short belts with a counter that stops the belt at each full box.
  • In this plant, payroll lists about 15 operators and material handlers per shift for 26 presses, so most presses already share a person.
  • We found no published figure for the hours a shared table frees, so that share is our estimate.
Limitations
  • No cash is saved unless the freed person takes over work now done on overtime.
  • Payroll shows about 180 overtime hours per week, about 9,000 per year, and the 1,875 hours freed here are 21 percent of that.
  • One person also checks the parts of two presses, so each part gets a shorter look.

Illustrative sample. The plant, the walk and the footage are synthetic. Figures from our analysis are estimates made with AI, not guarantees.