Back

Pythia Industries

Sample Plant

Lower the pressure only

Quick fix
Extra pressureCompressorswork harder1The pressure is higherthan the presses need
  1. SolutionLower the pressure two psi at a time, to just above what the presses need, and leave the leaks as they are.
Saves per year$2,200
CostAbout $160 of staff time
PaybackAbout four weeks
CatchIt leaves the leaks as they are, and saves nothing if the pressure already sits just above what the presses need.

Illustrative sample. The plant, the walk and the footage are synthetic. Figures from our analysis are estimates made with AI, not guarantees.