Press hours lost waiting for parts
| Value | 2 hours per week |
| Range | 0.5 to 5 hours per week |
| Source | Our estimate, as the repair log does not say how long a repair waits for a part |
Pythia Industries
Sample Plant
| Value | 2 hours per week |
| Range | 0.5 to 5 hours per week |
| Source | Our estimate, as the repair log does not say how long a repair waits for a part |
Illustrative sample. The plant, the walk and the footage are synthetic. Figures from our analysis are estimates made with AI, not guarantees.