Verification
| Test | - A supervisor watches one press on a long job for an hour, with a stopwatch.
- For 30 cycles (one cycle is one shot of the press, from mold closed to part out), they time the trimming and packing, and the waiting.
- They also note whether the press beside it runs a long job too.
|
| Cost | About $45: one hour of a supervisor's time. Nothing is bought, and the press keeps running. |
| Duration | One hour at one press |
| Confirmed if | Trimming and packing take less than about a third of each cycle. Then one person has time for a second press. |
| Ruled out if | - Trimming and packing take more than half of each cycle.
- Then one person cannot keep up with two presses, and only changing the gate in the mold can help.
- Between a third and half, it depends on the press it would pair with, so time that press too.
|
Illustrative sample. The plant, the walk and the footage are synthetic. Figures from our analysis are estimates made with AI, not guarantees.