Verification
| Test | - On five running jobs, read the cooling timer and measure the thickest wall of the part.
- Work out the cooling time that wall needs, from the standard formula in molding handbooks and the plastic's data sheet.
- Compare the two times.
|
| Cost | Under $100: about an hour of a process technician's time. Nothing is bought. |
| Duration | About an hour, while the presses run |
| Confirmed if | At least one timer runs a quarter or more longer than its wall needs. |
| Ruled out if | No timer runs longer than its wall needs. Then the timers are already right, and there is nothing to save. |
Illustrative sample. The plant, the walk and the footage are synthetic. Figures from our analysis are estimates made with AI, not guarantees.