Evidence
A mold cleaned on the bench between two jobs
A mold just out of its press is opened on the bench and cleaned before it goes to the rack. Its counter had reached its cleaning count, and its press was already running the next job.
Mold shop, Sep 3, 6:20 am, Camera 13
When the eight molds stopped a press, and why
The downtime log lists each stop the eight molds caused this week, with its time and its cause. Two of the 4 stops came on Aug 31, before the last two molds were cleaned.
Aug 31 to Sep 4, ERP downtime log
| Date | Time the press stopped | Cause logged |
|---|---|---|
| Aug 31 | 9:15 am | A part stuck in the mold |
| Aug 31 | 7:40 pm | Plastic leaked where the mold closes |
| Sep 2 | 2:05 pm | A part stuck in the mold |
| Sep 4 | 11:30 pm | Burned parts |