Pythia Industries

Sample Plant

Evidence

The cart ready before the press stops

The press is still making parts, with the next mold and a cart of its hoses and tools waiting beside it. Nothing was left to fetch once the press stopped, and this mold change took 47 minutes, against 63 before.

Press 7, Aug 27, 10:05 am, Camera 3

Mold changes with a loaded cart and without one

The job log shows how long each mold change took, and the cameras show only one press had a cart. The press with a cart took 46 minutes on average, and the press without one took 63.

Presses 7 and 12, Aug 24 to Aug 28, ERP job log

From the plant's ERP
DatePressOld job endedNext job's first good partPress stopped for
Aug 25Press 128:20 am9:24 am64 minutes
Aug 26Press 123:40 pm4:42 pm62 minutes
Aug 27Press 710:15 am11:02 am47 minutes
Aug 28Press 77:30 pm8:15 pm45 minutes

Illustrative sample. The plant, the walk and the footage are synthetic. Figures from our analysis are estimates made with AI, not guarantees.