The press empty a third time while its mold is away

The press stands open with no mold in it, 50 minutes into the wait. As on Sep 8 and Sep 9, nobody is working on the press, so the lost time is waiting for the mold.

Press 5, Sep 11, 8:30 am, Camera 3

Each wait for a mold so far, and the press time it cost

The ERP job log shows how long the press waited for each mold, how long each swap took and the whole stop. Each swap took under an hour, so most of the 8 hours the press was stopped went to waiting for molds.

Press 5, Sep 8 to Sep 11, ERP job log

From the plant's ERP
DateWaiting for the moldSwapping the moldPress stopped for
Sep 81 hour 30 minutes55 minutes2 hours 25 minutes
Sep 92 hours 10 minutes55 minutes3 hours 5 minutes
Sep 111 hour 40 minutes50 minutes2 hours 30 minutes
Sep 8 to Sep 115 hours 20 minutes2 hours 40 minutes8 hours